working proof
Here’s some proof that I HAVE been doing something.
Bear A (you know, since they are baby A and baby b) underway. Before we knew there were two I had decided to double the size of the bear. This big square of garter stitch (and the small square) is most of Bear’s body and Bear’s nose; and comprise an entire skein knitted up. I just joined a new ball and have about an inch on the big piece to finish its body. Those two other skeins in the back. Those are bonus! I had forgotten I’d ordered 4 skeins and I was getting nervous about having to order more and the potential of mixing fiber lots. Thank goodness I’m a yarn-aholic and always order extra!
The spinning I started a couple of weeks ago. I’m aiming for something a little chunkier and not necessarily even. I think these will make some fun mittens. If not enough for that maybe some booties.
Thanks everyone for the feedback! I’ve got lots to do now! The mouse mobile is for sure a go! Amelie is being knit (twice!) by the awesome Dyan. My mom is going to take on the Cupcake set (go mom!), she is doing quite well with her knitting. I have enough yarn to make the 1-2 year on the argyle set … so I think I’m going to put that off for a while. The ribbon-tie dress is really growing on me. I think I’m going to start that in a 3-6 month size. That should be a nice fall thing – something cute to wear for the arts festival.
With plans laid – I must got knit!




